The Body In The Service Station (Part 4, page 2 of 7)


Previous Page
Next Page

Part 4

The next day the lift company came out and test them and said they just needed some hydraulic fluid added so that company did that and the lifts quit their squealing. The next day the EPA came out and check both gas tanks and said they were in great shape and could be filled with gasoline.Jack called the local oil manufactory company and got ahold of someone who could come out and sale him the pumps that he wanted.

‚Äč The next day the oil campany was there and measured and the service station had enough room for four vehicles at one time. and sold Jack two pumps with one hose on each side and scheduled to have them installed a week from that day. The next Friday the pumps was installed and inspected by the EPA and Jack got his approval and document saying he had fulfilled his obligation and was ready to have a business license

Previous Page
Next Page

Send me an email if more parts are published.

Rate This Book

Current Rating: 3.0/5 (2 votes cast)


Review This Book or Post a Comment